East Wing 3
Cutting the ceiling out between the two cabins.

Looking into the old cabin from the new cabin upstairs.

The tongue and groove ceiling almost finished.

"Ozark Dan" helping put the ceiling up before he and Adam go moose hunting.

Lyndy standing in the passage way between the two cabins downstairs.

Plumbing in the new bathroom.  It was a little difficult because we had to work from the top down, which is backwards from most plumbing jobs.

Almost ready to set the tub.

The tub is useable now!

The cabin at night.

Just let me know what you need Dad and I'll get it for you.